Our products are certified by the Institute of Mechanization of Building and Rock Mining and the safety mark B.
Compliance with PN-EN 12810 – Façade scaffolding made of prefabricated elements and PN-EN 12811 – Temporary structures used on the construction site – Information on materials.
Initial element
The initial element is mounted on screw bases, and stands with rosettes are placed on them.
Transoms and vertical braces from the ‘0’ level are also connected to the initial element.
The element enabling the assembly of the first scaffolding level and the assembly of the stands, is put directly on the screw jacks, Base profile – ø 57.3
Parameters and variants
catalog number | height [m] | scales [kg] |
---|---|---|
SLV-M-01-05-01
|
0,23 | 1,40 |
SLV-M-01-05-01
|
0,33 | 3,10 |
Ask for an offer
Modular scaffolding enables the implementation of even the most complex projects. Most often